Estimated lead time: 2 working days (per Vestil).
The Roller Conveyor can be placed on the floor next to your work station or used in dock areas. Minimizes the reliance on a fork truck, lifting, and carrying. The zinc plated steel frame resists corrosion while the spring loaded rollers are set low in the frame. Couplers are included to join units together.

