Parts Department Remodel and Relocation Storage Planning

Re-shelving a parts department that cannot close. How to phase a parts room remodel, relocation or facility upgrade so the counter keeps filling orders while the old shelving comes out and the new system goes in.

Newly installed blue steel parts shelving with empty adjustable shelves before stocking

Phase, don’t pause

The parts room has to keep filling repair orders through the whole project

Bin-mapped move

Every part gets a new location before it is touched, not after

Clear egress

Exit routes and aisles stay unobstructed during every phase, by rule

One trade, one plan

Shelving, rack, drawers, mezzanine and enclosures sequenced together

The hardest part of a parts room project is that it stays open

Parts departments get rebuilt for a handful of reasons: a facility upgrade the manufacturer requires, a building expansion, a move to a new store, a service drive redesign that takes floor away from the parts room, or simply shelving that has been reconfigured so many times it no longer matches the inventory. What every one of those projects has in common is that the department cannot stop. Technicians still need parts on the same morning, the counter still has customers, and the wholesale routes still leave at the same times.

That constraint is what makes these projects fail. A straightforward shelving replacement becomes a two-week outage because nobody sequenced it; inventory that was moved without location mapping cannot be found for a month; a new layout is built around the old inventory profile because the purge never happened first. None of those are product problems. They are planning problems, and they are avoidable.

This page is the sequencing side of a parts room project. For the layout principles themselves — zoning, travel, slotting and workflow — start with our automotive parts storage systems overview and our parts room design guidance.

Automotive parts room with red steel shelving, integrated drawer cabinets and tire storage
A rebuild is the only realistic chance to change the shape of the room — use it deliberately.

Do these five things before anything is ordered

The decisions that determine whether a remodel succeeds are made months before the first bay is unbolted.

Step Why it comes first What it produces
Purge, then measure Designing new shelving around inventory you are about to write off buys capacity you do not need. Slow, obsolete, core and return inventory should be worked down before the room is sized. A realistic inventory profile: line count, cube by movement class, and the real oversize list.
Profile the inventory by cube and movement Shelf depths, opening heights and the split between shelving, drawers, rack and bins all follow from the physical inventory, not from a catalog. Bay counts by type, and a defensible split between shelving, drawer cabinets and rack.
Draw the room, including the constraints Columns, doors, sprinkler heads, lighting, HVAC, existing electrical and the clear height that actually exists — not the height on the original drawing. A layout that survives contact with the building.
Decide the phasing before the layout is final A layout that can only be built in one shot is a layout that closes the department. Phased builds need a swing area designed into them. A phase plan: which zone moves first, where its inventory lives meanwhile, and what stays reachable.
Fix the location scheme now Renumbering locations is far cheaper on paper than on steel. The new bin-location scheme should exist before the first shelf is hung. A location map that the move plan can be built against, and labels that arrive with the shelving.

Purge first, buy second

The most common expensive mistake in a parts room rebuild is sizing new storage around inventory that has not moved in years. Work the obsolescence, returns and core piles down first — then size the room. See our obsolete parts, returns and core storage guidance for how to run that before a project.

Phasing a rebuild in a department that stays open

Shelving aisle during installation with new units partially built out
Each phase should leave one complete, working aisle behind it — not a half-built room.

Almost every occupied parts room rebuild uses the same underlying trick: create a temporary swing area, move one zone into it, rebuild the vacated zone, move that zone’s inventory into its permanent home, and repeat. The swing area is the whole plan. Without one, each phase has nowhere to put the parts it displaces.

  • Find the swing space before you commit. A mezzanine deck, an adjacent bay, a leased trailer, a section of the shop floor, or the space freed by the purge itself. It has to be secure, dry and reachable.
  • Phase by zone, not by product type. Moving “all the filters” scatters a category across two systems for weeks. Moving a contiguous zone keeps picking coherent.
  • Keep the fast movers reachable in every phase. The parts that support today’s repair orders should never be the ones in transit. Sequence phases so the top movers are either in their old home or their new one, never in a box.
  • Move by location, with the new address assigned first. Every carton is labeled with its new bin location before it leaves the old shelf, and the system is updated as it lands. Unmapped moves are what produce a month of lost sales.
  • Install outside peak hours where practical. Anchoring, cutting and lifting are disruptive and noisy; the counter’s peak hours are predictable. Sequence installation crews around them.
  • Protect the working aisles. Federal rules require aisles and passageways to be kept clear and exit routes unobstructed — during a phased install those are the first things to disappear under staged steel and packaging. Build the debris and staging plan into the phase plan.

Building constraints that change the design

These are the site issues that most often force a layout revision when they are discovered late instead of early.

📏

Real clear height, not drawing height

Ductwork, lighting, sprinkler mains and structure routinely take a foot or more off the height a drawing suggests. Measure to the lowest obstruction over each aisle, because that is what limits the top shelf.

🔥

Sprinkler clearance and coverage

Storage height near sprinklers is governed by fire code and the system’s design basis, and adding shelving, a deck or high-piled storage can change what the system has to do. Involve the fire protection contractor and the AHJ before the layout is final.

🔧

Anchorage and the slab

Shelving, rack and mezzanines are anchored, and slab thickness, reinforcement and joint locations matter. Seismic requirements in many western states drive both anchorage and bracing details.

💡

Lighting runs versus aisle direction

Rotating the aisle direction of a room without moving the lights leaves aisles dim. Plan lighting with the layout; it is far cheaper during a rebuild than after.

🚪

Doors, egress and travel distance

New runs of shelving change the paths people take to exits. Exit routes must stay unobstructed and travel distances still have to work with the room fully built.

🏭

Permits and jurisdiction

Mezzanines, high-piled storage, electrical work and structural anchorage frequently require permits and inspections. Confirm scope with your local building department early rather than mid-install.

Design assistance is not engineering approval

Our layouts, capacity guidance and product selection are planning tools. Permits, stamped drawings, seismic calculations, fire protection design and code compliance for your specific site are determined by licensed professionals and your authority having jurisdiction. Build that review into the schedule from the start.

Rebuilding, relocating or expanding a parts department?

Send us the floor plan and a rough inventory profile. We will lay out the room, propose a phase plan that keeps the counter open, and quote the shelving, rack, drawers, mezzanine and installation as one project.

Request a Parts Room Layout See all automotive storage solutions Call (800) 326-4403

The move itself, in order

1

Freeze the location scheme

New bin locations are assigned and loaded in the system before anything physically moves. Every carton leaves the old shelf already carrying its destination.

2

Stage the purge first

Obsolescence, cores and returns are worked, shipped or relocated to compressed storage before the move. Nobody should carry dead inventory twice.

3

Build the first zone complete

Steel, decking, dividers, labels and lighting for phase one are finished before any inventory arrives. A half-finished zone accumulates unlabeled stock.

4

Move by location, verify on landing

Parts are moved a bay at a time and confirmed into their new location as they land. A verification step at the shelf is what makes the first week after the move survivable.

5

Re-slot as you go, using real demand

A move is the one chance to put fast movers near the counter and technician window. Use recent demand data, not the old layout, to decide what lands where.

6

Run a post-move accuracy check

Cycle-count the moved zone before starting the next phase. Errors found in one zone are cheap; errors found across a finished room are not.

7

Update everything that references locations

Pick sequences, labels, signage, the counter’s lookup habits and any printed aids. A correct system with stale labels behaves like an incorrect system.

Use the rebuild to change the shape of the room

Steel mezzanine with stair access built over blue parts shelving in a storage room
A rebuild is the practical moment to add a second level — retrofitting one later means moving inventory twice.

A remodel is expensive attention. Spending it to reinstall the same room in new steel wastes the one moment when the layout can genuinely change. Three moves are worth evaluating every time. Groups running several stores should build each project against one standard — see dealer group parts room standardization.

Go up before you go out. Most parts rooms have unused clear height above the shelving. A second level or an upper deck converts that volume into floor area at a fraction of the cost of leased square footage — and a rebuild is the only practical time to install one. Our parts room mezzanine guidance covers when it pencils.

Compress small parts out of shelf openings. Fasteners, sensors, clips and electrical parts consume enormous shelf face for very little cube. Moving them into modular drawer cabinets during the rebuild typically frees a surprising number of bays for the inventory that actually needs them.

Split bulk from pick. Case-lot and bulky inventory belongs on rack above or behind a pick level, not in a shelving aisle. Establishing that split during a rebuild is far easier than retrofitting it into a working room — the same principle we apply in auto parts warehouse shelving and slotting.

Relocating to a new building

Three-dimensional layout drawing of a shelving and parts cart system with title block
A drawn layout is what makes a phase plan, a permit conversation and an install schedule possible.

A full relocation removes the swing-area problem and replaces it with a cut-over problem: for some period, inventory exists in two buildings and the department has to serve customers from both. The sequencing changes accordingly.

  • Install the new room completely first. Steel, labels, lighting and enclosures should be finished and inspected before the first carton arrives. Installing around inventory doubles the labor.
  • Move slow inventory first, fast movers last. The parts that support daily work should spend the least possible time in transit, which means they move in the final window.
  • Plan the dual-location period explicitly. Decide how orders are filled while stock is split, who picks at each site, and how the system reflects both. Ambiguity here is where the lost sales occur.
  • Reuse only what is worth reusing. Old shelving is often mismatched, damaged or the wrong depth for current inventory. Dismantling, transporting and rebuilding it has a real cost; compare it honestly against new steel that matches the new layout.
  • Book the decommission. Removal and disposal of old shelving, rack and fixtures is a scope item with a cost and a schedule. Left unplanned, it holds the old building hostage past the lease date.

We handle both sides of this — layout and supply of the new room, and teardown and removal of the old one — so the schedule sits with one project team.

Shop Related Automotive Parts-Room Products

These catalog products support parts organization and handling; they are not a custom-designed automotive storage system. Confirm specifications and project suitability before ordering.

Parts department remodel and relocation FAQs

Can a parts department be re-shelved without closing?
In almost every case, yes — but only with a phase plan and a swing area. The standard approach is to create temporary space (often freed by purging obsolescence first), move one contiguous zone into it, rebuild that zone completely, move inventory into its permanent locations, then repeat. The fast-moving inventory that supports daily repair orders should always be either in its old home or its new one, never in transit.
How long does a parts room remodel take?
It depends on bay count, phase count, how much inventory has to move and how much of the work can happen outside operating hours — so no honest single answer exists. What we can do is build a schedule from your layout: install duration per phase, move effort per zone, and the sequence that keeps the counter open. Ask for that schedule before you commit to a date with your manufacturer or landlord.
Should we purge inventory before or after the move?
Before, without exception. Sizing new storage around inventory that has not sold in years buys capacity you do not need, and moving dead stock means paying to handle it twice. Work obsolescence, cores and returns down first, then profile what remains and size the room to that.
Do we need permits to re-shelve a parts department?
Simple shelving replacement often does not, but mezzanines, high-piled storage, structural anchorage, electrical work and changes affecting fire protection frequently do. Requirements vary by jurisdiction and by what your fire protection system was designed for. Confirm scope with your local building department and fire authority during design rather than mid-install.
How should inventory be moved so nothing gets lost?
Assign new bin locations in the system before anything moves, label every carton with its destination as it leaves the old shelf, confirm each item into its new location as it lands, and cycle-count the zone before starting the next phase. Unmapped moves — where parts are relocated and the system is updated afterwards from memory — are the single largest cause of post-move lost sales.
Is it worth reusing our existing shelving?
Sometimes. Reuse makes sense when the existing steel is in good condition, matches the depths and heights the new layout needs, and there is enough of it to build coherent runs. It makes less sense when the inventory profile has changed, when units are mismatched from years of reconfiguration, or when dismantle-transport-rebuild labor approaches the cost of new steel that matches the design.
What if the manufacturer’s facility program is driving the project?
Facility upgrade programs generally dictate customer-facing space, finishes and layout, and the parts department frequently loses floor area to them. That makes the storage design more constrained, not less important: the usual answer is to recover the lost area vertically with a second level or upper storage, compress small parts into drawers, and split bulk onto rack. Bring the constraint to the layout conversation early — it changes what we propose.
Can Material Handling USA handle the whole project?
Yes. We design the layout, supply the shelving, rack, drawer cabinets, bins, workstations, enclosures and mezzanines, install in phases around your operating hours, and remove old fixtures as part of the same scope. Permits, stamped engineering and code compliance for your site remain with licensed professionals and your authority having jurisdiction, and we plan around that review.

Rebuild the room without closing the counter

Material Handling USA designs, supplies, phases and installs complete parts department storage — shelving, rack, drawer cabinets, workstations, enclosures and mezzanines — for dealerships, service facilities and parts warehouses nationwide.

Headquartered in Salt Lake City, UT • Serving customers nationwide
Local service areas: Salt Lake City • Provo • Ogden • Park City • St. George • Logan • Lehi • Orem