Industrial Shelving

Industrial shelving for manufacturing plants, maintenance storerooms, parts rooms, tool cribs and distribution centers: steel, rivet, wire and bin systems chosen for the room, the environment and the load. MH-USA plans, quotes and installs nationwide from Salt Lake City.

Since 1997 · 50 states shipped · sales@mh-usa.com

Rows of gray industrial shelving stocked with cartons and small-parts bins in a warehouse

18–22 ga

Steel shelf gauges, heaviest to standard

350–2,000+ lb

Per-shelf capacity range across the families

1½″

Typical shelf adjustment increment

(800) 326-4403

Talk to a shelving specialist

Shop Industrial Shelving by Category

Online prices for rivet rack, bulk storage rack and 18- and 20-gauge steel shelving starter units. Some common sizes are in stock at select manufacturers, subject to confirmation. For a full run, other sizes or an installed system, request a quote and we size it to the heaviest shelf first.

Lyon 3 Level 48″w x 24″d x 84″h Rivet Rack Starter – Dove GrayHeavy-Duty Rivet RackWide, deep rivet bays for heavy cartons and bulky partsStarter units from $197.43e.g. Lyon 3 Level 48″w x 24″d x 84″h Rivet Rack Starter – Dove Gray · $197.43Shop Rivet RackRead the heavy duty shelving guide
Lyon 3 Level 60″w x 24″d x 72″h Bulk Storage Rack with Front-to-Back Supports Starter – Dove GrayBulk Storage RackLong, heavy hand-stacked items on wide levelsStarter units from $524.70e.g. Lyon 3 Level 60″w x 24″d x 72″h Bulk Storage Rack with Front-to-Back Supports Starter – Dove Gray · $524.70Shop Bulk RackRead the bulk rack guide
Lyon 8000 Series 36″w x 12″d x 84″h Closed Steel Shelving with 5 Shelves Starter – 20 Gauge – Heavy-Duty – Dove GrayHeavy-Duty Closed Steel (20 ga)Closed-back 20-gauge units for contained parts storageStarter units from $533.54e.g. Lyon 8000 Series 36″w x 12″d x 84″h Closed Steel Shelving with 5 Shelves Starter – 20 Gauge – Heavy-Duty – Dove Gray · $533.54Shop Closed SteelCompare open and closed steel

What “industrial shelving” actually covers

Industrial shelving is hand-loaded storage built to carry heavier, denser loads than office or retail fixtures: steel posts, steel or engineered decks, and shelf capacities from a few hundred pounds up to several thousand pounds per level. It is not pallet rack — nothing on it is placed by a forklift — but it is the storage that sits beside pallet rack in almost every warehouse, plant and parts department.

The phrase covers six different constructions that are quoted, installed and priced very differently. A buyer who searches “industrial shelving” is usually still deciding among them: boltless rivet shelving for cartons and bulk items, steel clip shelving for small parts that must sit on a solid surface, wire shelving where air and light need to pass through, bulk rack for wide, heavy hand-stacked items, bin shelving for piece-picked components, and stainless where washdown or corrosion is the constraint.

This page is for plant, maintenance and warehouse teams fitting out working industrial space. It covers how to read a capacity rating, which decks suit oily, wet or cold rooms, what each plant area usually needs and how a tall run is anchored, then hands you to the detailed family page: steel shelving, boltless shelving, bulk rack, wide span shelving, bin shelving, or parts shelving for a parts room. For every shelving family side by side, start at shelving solutions.

Long warehouse aisle of steel industrial shelving bays loaded with cartons and blue parts bins
  • Six industrial shelving constructions from the manufacturers MH-USA represents — Lyon, Penco, Tennsco, Hallowell, Borroughs, Equipto, Jaken, Metro, Nexel and Quantum
  • Shelf ratings taken from each manufacturer’s current literature and written on the quote for the exact size
  • Seismic anchoring, aisle clearance and egress reviewed for Utah, Idaho, Nevada, Colorado and Arizona installs
  • Freight, phased installation and removal of the old shelving quoted with the new run

Match the construction to the heaviest shelf

The hub page compares every shelving family. On a heavy-duty job the shortlist is shorter: start from the heaviest single shelf and the shape of what sits on it, and the construction follows. Ratings below are typical published per-shelf figures for uniformly distributed loads; every quote states the exact figure for the series, width and gauge selected.

What sits on the heaviest shelf Construction that usually wins Typical per-shelf rating Detail
Small, dense parts and hardware that must sit flat Steel clip shelving, 22 ga standard; 20 or 18 ga when the shelf is loaded heavy 350–800 lb by gauge and width Steel shelving
Heavy cartons, motors, castings, tool cases Boltless rivet shelving with a double-rivet beam and steel or board decks 1,200–2,500 lb per level, by beam and width Heavy duty shelving
Long, wide or bulky items stacked by hand Bulk storage rack with wire, board or steel decks 1,000–3,000+ lb per level Bulk rack shelving
Piece-picked components counted by location Steel shelving supplied with bins and dividers As the steel host unit (typically 400 lb) Bin shelving
Anything a forklift will ever place Not shelving — quote pallet rack Beam-pair ratings Shelving vs pallet rack

Wire and stainless units are built for airflow and washdown rooms rather than weight; they are covered on wire shelving and stainless steel shelving. When the job is a parts department, go straight to parts shelving.

Load capacity: how to read the number on the spec sheet

Every industrial shelving series publishes a per-shelf capacity for a uniformly distributed load — the weight spread evenly across the whole shelf area. Concentrating the same weight at the center of a 48″ boltless beam or a 36″ steel shelf reduces what it can carry, and nobody publishes a point-load rating for shelving the way they do for pallet rack beams.

Three numbers matter on a quote:

  • Shelf capacity — the published uniformly distributed rating for that series, width and depth.
  • Unit capacity — the total the posts or uprights will carry; shelf capacity × shelf count is usually higher than this, and the lower figure governs.
  • Floor loading — a fully loaded 84″ run of bulk rack can exceed what a mezzanine or slab-on-grade with a thin topping was designed for; check before you stack.

Heavier loads do not always mean heavier gauge. Heavy-duty rivet and boltless shelving reaches 1,200 to 2,500 lb per level with channel beams, while 22-gauge steel clip shelving tops out around 400 lb but wins on rigidity for small parts. Match the construction to the load pattern, not the headline number.

Long run of gray steel industrial shelving holding boxed parts and gray totes in a stockroom

Decking and shelf surfaces: the choice that decides what the shelf can hold

Steel industrial shelving bay fitted with galvanized welded wire mesh decking

On boltless rivet and bulk rack the beams carry the load, and the deck only has to bridge between them — so the deck material is a separate decision:

  • Particleboard — lowest cost, solid surface, fine for cartons and dry rooms; swells if wet and should not carry concentrated point loads.
  • Steel decks — solid, wipeable, rated for heavier and smaller items; specify where parts are loose or the room is washed.
  • Wire mesh decks — galvanized welded wire lets sprinkler water and light through and is usually required by the fire marshal on tall runs; small items need a bin or tray.
  • Solid steel shelves (clip shelving) — the shelf is the structure. 22 gauge is standard, 20 and 18 gauge for higher ratings; reinforcing channels add capacity to a wide shelf.

Where a run mixes loads, mix decks: wire mesh on upper levels for sprinkler clearance, board or steel on picking levels. The detailed trade-offs are on boltless shelving decking options.

Standard vs. heavy duty industrial shelving

Most industrial shelving in a plant is standard duty: 22 gauge steel shelves for bins and boxed spares, or single-rivet boltless for cartons. Step up only where the stock demands it, such as motors, castings, dies or pails on the lower levels of a maintenance storeroom.

When a level has to carry more than about 1,000 lb, or single items weigh a few hundred pounds, see our heavy duty shelving page for published ratings by type, from 800 lb wire shelves to 2,500 lb boltless levels. Four components decide which class a unit falls in:

Aisle of bulk storage shelving with wood decking holding hose, fittings and loose heavy parts
Shelf gaugeOn steel clip shelving the shelf is the structure. 22 gauge is standard; 20 gauge (heavy-duty) and 18 gauge (extra heavy-duty) are thicker steel — the lower the number, the heavier the shelf. Reinforcing channels under a wide shelf add capacity without changing gauge.
Posts and uprightsSteel shelving runs on angle, beaded or T-post uprights; boltless and bulk rack use keyhole uprights that the beam rivets lock into. The upright sets the unit capacity — shelf rating × shelf count is often higher, and the lower figure governs.
Beams and decksOn rivet and bulk rack the beams carry the load: a double-rivet beam is the heavy-duty version. The deck only bridges the beams, so deep levels add center supports and the deck material is chosen for the load and the room.
BracingSway braces stiffen open steel units taller than 75″, closed backs and sides stiffen a run and stop stock pushing through, and row spacers keep back-to-back runs plumb. Bracing is part of the capacity, not an accessory.

Anchoring, seismic and safe loading on tall runs

Continuous run of gray steel clip shelving with open bays transitioning to closed-back bays

A heavy-duty run is only as safe as how it is fixed and loaded. Floor anchors and top ties are part of every MH-USA quote in Utah, Idaho, Nevada and California, and we recommend them anywhere a unit is tall, back-to-back or loaded from a step or ladder.

Load the heaviest stock on the lowest levels, keep the top shelf at a height people can reach without climbing — 72″ is a common target — and post the published shelf capacity on the run so the team knows the limit. Check the slab too: a fully loaded 84″ run of bulk rack can exceed what a mezzanine deck or a thin topping slab was designed for.

  • Anchors and top ties on every post in seismic regions; row spacers on back-to-back runs.
  • Heaviest loads low, lighter and slower-moving stock on the upper levels.
  • Wire mesh decks on upper levels where sprinkler clearance or the fire marshal requires water to pass through.
  • Capacity documented: every run we install leaves with the published shelf capacity and the anchoring detail written down for your safety team.
  • Working plants stay running: we stage the new run beside the old one, swap a few bays per shift and move stock once, so the line or crib never loses access to spares.

We do not certify that a shelving installation “meets code.” Seismic anchoring, aisle widths, egress and sprinkler clearance are set by your local authority having jurisdiction; we build to published manufacturer data and document what was installed for your review.

Codes and standards that apply

Rule or standard What it covers What it means for your shelving
OSHA 29 CFR 1910.176(b) Secure storage of material Stored items must be stable and secure against sliding or collapse
OSHA 29 CFR 1910.22(b) Walking-working surface loads Floors and mezzanines must support the maximum intended load, including loaded shelving
ANSI MH28.1 (MHI Shelving Manufacturers Association) Design, testing and use of industrial steel bin shelving The industry standard behind published shelving ratings, including multi-level and mobile shelving
NFPA 13 Sprinkler installation Shelving directly under sprinklers stays at least 18 in. below the deflectors
Local building code Seismic anchoring and permits Your building official sets anchoring and permit rules, especially in seismic areas
ANSI MH16.1 (RMI) Steel pallet racks Applies to pallet rack, not shelving; relevant once forklifts load the system

Industrial shelving by environment: oil, water, cold and dust

Metro Super Erecta wire shelving unit in green Metroseal epoxy finish with five shelves

The room often decides the shelving before the load does. Particleboard swells in a wash bay, chrome wire spots in a damp cooler, and open wire decks drop small parts in a machine shop. Start with the environment, then pick the construction and finish that will still look and work right in five years.

Epoxy-coated wire, like Metro’s green Metroseal finish, is a common choice for coolers and damp rooms because it resists corrosion and lets air move. See wire shelving and stainless steel shelving for finish details.

Photo: Metro

Environment What we usually specify Why
Oily or greasy (machine shops, fleet bays) Steel shelves or steel decks, closed backs on low levels Wipes clean; oil does not soak in like board decks
Wet or washdown (food plants, wash bays) Stainless or epoxy-coated wire, open decks Water drains through; no swelling or rust staining
Cold and freezer rooms Epoxy or stainless wire shelving Airflow around stock; finish rated for condensation
Dusty or abrasive (foundries, woodshops) Closed steel shelving with doors or bins Keeps dust off spares and small parts
Heat and outdoor yards Galvanized steel shelving Holds up to weather; see galvanized shelving
Sprinklered high bays Wire mesh decks on upper levels Lets sprinkler water reach lower levels

What each part of a plant or warehouse usually needs

A single facility can need four kinds of shelving. The maintenance storeroom wants closed steel with bins for bearings and seals, the tool crib wants lockable bays, receiving wants wide rivet bays for cartons, and the line wants short, low units close to the work.

We plan each area on its own, then keep the runs consistent in post style, color and height so parts and decks are interchangeable across the building.

Photo: Lyon Workspace

Rows of Lyon 8000 Series closed steel shelving with parts bins on a distribution center floor below a raised pick level
Area Typical stock Shelving that usually fits Watch for
Line-side and cells Kitted parts, fixtures, WIP Low rivet or steel units, often on casters Forklift and cart traffic; keep aisles clear
Maintenance (MRO) storeroom Bearings, belts, motors, filters Closed steel with bins, plus heavy rivet bays for motors Heavy items low; label by asset or part number
Tool crib Gauges, cutters, power tools Closed steel inside a tool crib partition Issue window and access control
Parts room Thousands of small SKUs Parts shelving with dividers and bins Location labels and pick paths
Receiving and shipping Cartons, returns, packaging Wide rivet or wide span bays Keep dock aisles and egress clear
Distribution pick areas Each-picks and slow movers Long boltless runs beside pallet rack Sprinkler clearance on upper levels

Sizing an industrial shelving run: a worked example

Planner measuring an aisle and laying out an industrial shelving run before ordering

Unit count comes from the room, shelf depth from the product and capacity from the heaviest shelf — in that order.

On a heavy-duty job the heaviest shelf decides the series for the whole row, so we size the light and heavy stock separately: small parts on steel clip shelving, the heavy exceptions on one row of double-rivet boltless or bulk rack. The example below is a typical parts room worked through all six steps.

Step What we ask Example: 30′ × 20′ parts room, 10′ clear ceiling
1. Inventory SKU count, carton or part sizes, heaviest items 2,400 SKUs, most under 12″ deep; brake rotors and batteries are the heavy exceptions
2. Depth Deepest common item plus 1″–2″ 12″ steel clip shelving for small parts; one 24″ boltless row for rotors and batteries
3. Height Ceiling minus sprinkler clearance, minus top-shelf reach 87″ posts; top shelf at 72″ so the last level is reachable without a ladder
4. Layout Aisle width for the picker or cart, egress, door swings Three double-sided rows on 36″ aisles + one wall row = 42 bays of 36″ steel + 8 bays of 48″ boltless
5. Capacity Heaviest shelf sets the series 22 ga steel at 400 lb/shelf for parts; heavy-duty rivet rack at 1,200 lb/level for the heavy row
6. Anchoring Slab type, seismic design category Floor-anchored posts with top ties on all rows; row spacers on back-to-back runs

Send us the room dimensions and a stock list and we return this table filled in for your facility, with the unit count, shelf count and a price by manufacturer. The SKU Upload Analyzer will do the first pass on your inventory file before we talk.

Where industrial shelving earns its keep

Eight applications we quote every month, with the construction that usually wins and why.

Automotive parts room aisle with steel shelving holding boxed parts, filters and fluidsParts Rooms & Parts DepartmentsSteel clip or bin shelving. Thousands of small SKUs picked by location; solid shelves, dividers and bins keep them separated. Parts shelving →
Boltless shelving holding components and fixtures beside a manufacturing lineManufacturing & Line-Side StorageBoltless with steel decks. Kitted components, fixtures and WIP staged where the line needs them; wide bays take totes two deep. Manufacturing storage →
Fulfillment warehouse with long rows of shelving and pack stationsDistribution & FulfillmentBoltless rivet shelving in long runs. Slow movers and each-picks beside the rack; wire decks upstairs for sprinklers. Distribution center shelving →
Wire mesh tool crib enclosure with industrial shelving and a service windowTool Cribs & MRO StorageClosed steel shelving inside a wire partition. Accountable tooling, spares and consumables issued through a window. Tool cribs →
Gray boltless rivet shelving rows holding kitted equipment cases in a government supply roomGovernment & Military SupplyBoltless or steel clip, GSA-priced. Accountable-property storage with numbered aisles and lockable bays. Government storage →
Boltless steel shelving holding fluids, consumables and bins in a fleet garageFleet & Maintenance GaragesBoltless with board or steel decks. Fluids, filters, PPE and shop supplies within reach of the bays. Fleet garage storage →
Steel parts shelving loaded with automotive accessories and boxed parts with tires stored aboveAutomotive Dealers & Repair ShopsSteel clip shelving with drawers and bins, plus bulk rack for tires. Fast-moving parts up front, bulk and tires at the back. Automotive shelving →
Steel shelving filled with archive record storage boxes in a records roomRecords & Archive StorageBoltless sized to the box. Letter/legal cartons two deep on 42″ or 48″ bays; convert to mobile when the room fills. Records storage →

Compare industrial shelving manufacturers

We quote every line below; the table shows where each one is usually the right answer. Follow the links for series detail and literature.

Manufacturer Constructions Typically specified for Detail
Lyon 8000 Series steel clip, 2000 Series closed steel, rivet rack, bulk rack Parts rooms and tool cribs; heavy-duty rivet rack starters and add-ons stocked online Lyon shelving
Penco Clipper steel shelving, Rivet Rite boltless Records, evidence, military and government supply; closed and secured bays Penco shelving
Tennsco Q Line, Imperial, Z Line steel; bulk storage rack Stockrooms, parts departments and bulk hand-loaded storage Tennsco shelving
Borroughs Rivet-Span boltless, Box Edge Plus steel, Flexi-Bins Automotive dealers and distributors; matched drawer cabinets Borroughs shelving
Hallowell Hi-Tech steel shelving, Rivetwell boltless, bulk rack General warehouse and plant storage; broad stocked range Hallowell
Equipto V-Grip steel shelving, bulk rack, wire rack Industrial parts and MRO storage with drawer and bin inserts Equipto V-Grip
Jaken / RiveTier Boltless rivet shelving, Fastrak bulk rack Warehouses and archives; configurable in our shelving configurator RiveTier shelving
Quantum Ironman 22 ga steel, bin shelving packages, wire kits Ready-to-ship units and shelving-with-bins packages priced online Build & price shelving
Open-back steel shelving run installed along a wall in a supply room

Lead times: MH-USA orders from each manufacturer rather than holding inventory, so every quote states the manufacturer’s current lead time and how freight reaches your dock or our installation crew. Stocked online units ship in days; a full run of closed steel shelving with drawers and doors is typically a few weeks.

Buying for a public plant, utility, school district or base? Most of these lines can be bought on a contract instead of open bids: GSA shelving contracts and state shelving contracts explain how.

Get a free quote

Tell us what you are storing, the room size and your timeline. A project specialist will follow up with layout options and pricing. Prefer to talk? Call (800) 326-4403.

Name

Industrial shelving FAQ

What is the difference between industrial shelving and commercial shelving?
Industrial shelving is built for heavier, denser hand-loaded storage — steel posts, steel or engineered decks and per-shelf capacities from roughly 350 lb to over 2,000 lb. Commercial shelving usually means lighter retail, office or backroom fixtures. Most warehouse, plant, parts-room and maintenance storage is industrial shelving.
Which industrial shelving type is strongest?
Per level, bulk rack and heavy-duty boltless rivet shelving carry the most — with published heavy-duty boltless ratings of up to 2,500 lb per level (Tennsco Z-Line heavy duty at 48 in. wide). Steel clip shelving is rated lower (about 350–800 lb per shelf) but is stiffer for small parts and can be fully closed.
What gauge steel is heavy-duty industrial shelving?
On steel clip shelving, 22 gauge is the standard shelf, 20 gauge is usually sold as heavy-duty and 18 gauge as extra heavy-duty. Lower gauge numbers mean thicker steel. Boltless rivet and bulk rack are rated by beam and deck instead of shelf gauge, and a double-rivet beam is the heavy-duty version.
How can I add capacity to industrial shelving I already own?
Start with what the posts will accept: extra beam pairs and decks, reinforcing channels under wide steel shelves, a heavier deck, or center supports on deep levels. Confirm the unit (upright) capacity first, because it governs. If the load now needs a different construction, we quote the replacement run and removal of the old shelving together.
Is industrial shelving the same as pallet rack?
No. Pallet rack is loaded by forklift and engineered for palletized unit loads. Industrial shelving is hand-loaded. Bulk rack sits between the two for heavy items that are still placed by hand. If a forklift will ever place the load, quote pallet rack.
How much weight can an industrial shelf hold?
It depends on the construction, width, depth and gauge. Manufacturers publish a uniformly distributed capacity per shelf or level; a 36″ × 18″ 22-gauge steel shelf is commonly rated at 400 lb, a 48″ heavy-duty boltless level at 1,200 to 2,500 lb depending on the beam. Ask for the published figure for the exact series and we will state it on the quote.
Does industrial shelving need to be anchored?
In seismic regions such as Utah, Idaho, Nevada and California, yes — floor anchors and top ties are standard on every MH-USA installation. Elsewhere, tall units, back-to-back rows and anything loaded from a step or ladder should be anchored. Your local authority having jurisdiction sets the requirement.
Can I add shelves or accessories to industrial shelving later?
Yes. Extra levels, decks, dividers, bins, label holders, back and side panels, doors and drawers are all add-ons on the major lines. Order them with the original unit when you can — matching gauge, finish and shelf lip on an older unit is harder later.
What decking should I use on boltless shelving?
Particleboard for dry cartons on a budget; steel decks for loose or heavy items and rooms that are washed; galvanized wire mesh where sprinkler coverage is required or airflow matters. Many runs mix decks by level.
Do you sell used industrial shelving?
We quote new shelving from the manufacturers we represent. Used shelving can look like a bargain, but the savings are usually used up by the time it is installed: parts rarely fit back together well after disassembly, and the installer time to straighten and fit them often costs more than new would have. Reusing shelving you already own can work, though new is sometimes still cheaper after the fix-up time. A quick call to our sales team with a few pictures can help us tell you the best option.
How long does industrial shelving take to deliver and install?
Stocked online units ship in days. Quoted runs depend on the manufacturer and finish — open steel and boltless are typically a few weeks, closed steel with doors and drawers longer. Installation for a parts room or stockroom is usually one to three days per crew, phased to keep the room working.
Do you install industrial shelving outside Utah?
Yes. We ship to all 50 states and install throughout the Mountain West from Salt Lake City, Boise and Las Vegas, with partner crews elsewhere. Freight and installation are quoted together.

Industrial shelving resources

Family pages, application guides and manufacturer detail — everything on this page routes to one of these.

Shelving Families

Shelving Solutions HubEvery shelving family we supply, compared.
Steel ShelvingOpen and closed steel clip shelving units.
Boltless ShelvingRivet shelving hub with application and city pages.
Wire ShelvingChrome, epoxy and stainless wire units.
Bulk Rack ShelvingWide, heavy hand-loaded storage.
Bin ShelvingShelving supplied complete with bins.
Metal ShelvingThe metal shelving family in buyer language.
Stainless Steel Shelving304, 430 and 316 grades.
Industrial Wall ShelvingWall-mounted units and brackets.

Applications & Guides

Parts ShelvingParts rooms, dealers and machine parts storage.
Industrial Storage ShelvingBoltless shelving for plants and warehouses.
Heavy Duty ShelvingSteel, boltless and wire units rated to 2,500 lb per level.
Wide Span ShelvingLong bays for bulky hand-stacked items.
Boltless Shelving vs Pallet RackingHand-loaded shelving compared with forklift-loaded rack.
Warehouse Shelving SystemsShelving beside rack.
Stockroom ShelvingReplenishment-driven backroom layouts.
Industrial Storage CabinetsCabinets that pair with shelving runs.
Security Cages & Wire PartitionsEnclosing a shelving run or tool crib.

Manufacturers & Purchasing

Lyon Shelving8000 and 2000 Series steel, rivet rack.
Penco ShelvingClipper and Rivet Rite.
Tennsco ShelvingQ Line, Imperial and Z Line.
Borroughs ShelvingRivet-Span, Box Edge and Flexi-Bins.
HallowellSteel and boltless shelving, bulk rack.
Equipto V-Grip ShelvingV-Grip shelving, bulk rack and wire rack.
GSA Shelving ContractsFederal purchasing routes.
Shelving BrochuresManufacturer literature.
Utah ShelvingSurveys, layouts and installation across Utah.

Send us your plant layout and stock list for an industrial shelving plan

Send the room dimensions and a stock list. We come back with the shelving type, unit count, shelf capacities, accessories and a price by manufacturer, with freight and installation included.

Headquartered in Salt Lake City, UT • Serving customers nationwide
Local service areas: Salt Lake City • Provo • Ogden • Park City • St. George • Logan • Lehi • Orem