Modular Buildings for Water and Wastewater Treatment Plants

Pump station and electrical buildings, operator control rooms, process labs and entrance booths, specified for damp, corrosive utility sites.

Call (800) 326-4403 or email Sales@MH-USA.com

Tan outdoor enclosure with a pitched roof, louvers and two wall-mounted HVAC units

Control & Electrical

Rooms and Buildings

Corrosion-Resistant

Finish Options

4 to 8 Weeks

Typical Lead Time, Subject to Confirmation

Nationwide

Delivery & Installation

Modular buildings for treatment plants and pump stations

Water and wastewater plants need small, durable buildings in places that are hard on structures: damp process areas, chemical rooms, outdoor pump stations and remote lift stations. Operators need a conditioned room for controls, electrical gear needs protection from moisture and heat, and lab staff need a clean place to run daily tests.

A modular building arrives with its walls, doors, HVAC and wiring already made, so a plant can add a room without a long construction project inside an operating facility.

Dark green skid-mounted electrical house with a door and louvers

This page covers the buildings utilities ask us for most. It is part of our in-plant and industrial modular buildings range. For offices inside existing plant buildings see modular in-plant offices; for gatehouses at plant entrances see guard booths.

Buildings utilities use at treatment sites

Small beige utility building with a sloped roof, a steel door and a wall HVAC unit on a gravel padPump and lift station buildingsSmall weather-tight buildings for pump controls, VFDs and electrical panels at remote stations.
Dark green outdoor equipment enclosure with HVAC units and a personnel doorElectrical and equipment buildingsOutdoor enclosures with HVAC and louvers to keep electrical and control equipment within its rated conditions.
Bright modular controlled-environment room with lab benches, stools and equipmentProcess and compliance labsConditioned rooms with benches and cleanable surfaces for daily process testing.
Finished white single-story modular office with a door and a long row of windows in a warehouseOperator offices and control roomsRooms for SCADA screens, records and shift handover, inside a plant building or freestanding.
Gray prefabricated exterior building with a standing-seam roof and windows on a concrete padOperator and maintenance buildingsFreestanding buildings for crew space, break rooms and parts storage near the process area.
Prefabricated booth protected by yellow barriers at a power plant with cooling towersPlant entrance boothsGate booths for deliveries, chemical trucks and visitor sign-in at the plant entrance.

Designing for moisture and chemical exposure

The environment around the building matters more than its size. Tell us what the room will be exposed to, and the finishes, hardware and HVAC are selected for it.

Condition Why it matters Options to ask about
Hydrogen sulfide (H2S) near headworks and wet wells Attacks bare steel, copper and many coatings Locate the building upwind and away from sources; coated or stainless hardware; sealed cable entries
Chlorine and hypochlorite feed areas Corrosive vapors and splash Separate the chemical room from electrical rooms; chemical-resistant interior finishes; dedicated ventilation
High humidity and washdown Condensation and standing water Insulated panels, sealed joints, raised or sloped floors and dehumidification
Outdoor exposure UV, freeze-thaw, wind and snow loads Weather roof, painted or stainless exterior skins, site-specific structural design
Electrical heat load VFDs and panels add heat that must leave the room HVAC sized to the equipment heat, filtered intakes, redundant units where needed

Material choices are confirmed per project; ask for the exterior skin, coatings and hardware specification on your drawings. For classified or hazardous locations, the area classification is set by your engineer; see our guide to rooms in classified areas.

Electrical and control buildings

White modular electrical building with its doors open, showing electrical equipment inside

Pump stations and treatment processes rely on motor control centers, VFDs, PLC panels and SCADA equipment. A modular electrical building keeps that gear dry, clean and within its temperature range, with working space laid out to your electrical engineer’s drawings.

We supply the building: structure, panels, doors sized for equipment, HVAC, lighting, convenience power and cable entries. Electrical equipment is supplied and installed by your electrical contractor or integrator. More on our modular electrical houses page.

Operator offices and on-site labs

Daily testing for things like pH, turbidity, chlorine residual and solids needs a clean, conditioned room near the process. A modular lab gives staff benches, a sink, cleanable wall and floor finishes and dedicated circuits for instruments.

Our guide to modular laboratory buildings covers ventilation, finishes and casework. For a separate control room with SCADA screens, see prefabricated control buildings.

Single-story modular in-plant office with a door and a row of windows on a warehouse floor

Typical specification

Item Typical for water and wastewater sites
Structure Steel frame with insulated wall and roof panels; designed for local wind, snow and seismic loads
Exterior Painted steel, stainless or other skins chosen for the exposure
Doors Commercial steel doors with closers; double doors or roll-up doors for equipment
HVAC Sized to equipment heat and climate; filtered intakes placed away from process odors
Electrical Lighting, convenience outlets and cable entries; equipment wiring by your electrical contractor
Base Concrete pad, piers or skid; lifting points for crane placement
Documents Stamped drawings and load data for plan review

See foundation and anchoring options and roofing and weather protection for exterior buildings.

Remote lift stations and unstaffed sites

Many utility buildings sit at sites nobody visits every day. A few choices make them easier to own.

🚚

Ship complete

Small buildings can be built and shipped as one unit, then set by crane on a prepared pad in a few hours.

🌡

Climate control with margin

HVAC sized for summer heat from drives and panels, with heat for winter, keeps equipment within its rated range.

🔒

Security

Steel doors, heavy hardware, limited glazing and conduit for alarms and cameras discourage break-ins.

💡

Service access

Doors sized for equipment removal, interior lighting and convenience outlets for technicians.

☁

Weather

Roof, skins and anchorage designed for local wind and snow, with drip edges over doors.

🔧

Low upkeep

Painted or stainless skins and sealed joints reduce maintenance; see our maintenance guide.

Keep chemicals and electrical gear apart

Chlorine, hypochlorite and other treatment chemicals give off vapors that corrode electrical equipment. When a site needs both, plan separate rooms with their own doors and ventilation, or separate buildings, so electrical and control gear does not share air with chemical storage. Secondary containment, eyewash stations and chemical-room ventilation follow your engineer’s design and the codes that apply.

What to send us for a quote

  • Use: electrical or control room, lab, operator building, chemical room or entrance booth.
  • Equipment list: panel and drive sizes and heat output, or your electrical drawings.
  • Exposure: H2S, chlorine, washdown or outdoor conditions around the building.
  • Site: pad or no pad, crane access, utilities, and city and state for loads and freight.
  • Specification: the bid spec or engineer’s documents if the project is public.

How a utility building project runs

1

Tell us the use

What happens inside the building, how many people or what equipment, where it sits and when you need it.

2

Layout and drawings

We return a layout and drawings with doors, windows, HVAC and electrical shown, plus a quote with exclusions listed.

3

Fabrication

After drawing approval, lead times are typically 4 to 8 weeks, subject to confirmation, for fabrication and freight.

4

Delivery and install

Panels or finished units arrive by truck and are assembled or set in place, then your trades make the final connections.

Public utilities often buy through a bid or an engineer’s specification. We can quote to your spec sheet and provide drawings and product data for the submittal. Architects and engineers can start with specifying modular buildings.

Frequently asked questions

Can a modular building handle a corrosive wastewater environment?
Yes, when the finishes, hardware and HVAC are chosen for the exposure. Tell us about H2S, chlorine or washdown near the building and we specify the exterior skin, coatings, hardware and ventilation for it. Siting the building away from odor sources also helps.
Do you supply the electrical equipment inside an electrical building?
We supply the building, including doors sized for equipment, HVAC, lighting, convenience power and cable entries. Switchgear, MCCs, VFDs and controls are supplied and installed by your electrical contractor or integrator to your engineer’s design.
Can you quote to an engineer’s specification for a public bid?
Yes. Send the specification and drawings, and we quote the building with product data and drawings for the submittal.
How long does a pump station building take?
Lead times are typically 4 to 8 weeks from approved drawings, subject to confirmation. Small buildings can ship complete and be set by crane on a prepared pad.
Do modular utility buildings need permits?
Usually, yes. Requirements vary by jurisdiction, so check with your local building department. We provide stamped drawings and load data for plan review.
Can one building hold both a lab and a control room?
Yes. A modular building can be divided into rooms with separate doors and HVAC zones, for example a control room, a lab and a restroom. Keep chemical storage out of rooms with electrical equipment.
Can the building be moved later?
Yes. Skid-mounted or complete units can be lifted and reset by crane, and panelized buildings can be taken down and reassembled. Tell us if a move is likely so the base and connections are planned for it.

Need a building at your treatment plant?

Tell us the use, the exposure around the building and the site. We will return a layout, drawings and a quote.

Headquartered in Salt Lake City, UT • Serving customers nationwide
Local service areas: Salt Lake City • Provo • Ogden • Park City • St. George • Logan • Lehi • Orem